(代做施工组织毕业设计)河南工程学院宿舍楼施工组织设计

(代做施工组织毕业设计)河南工程学院宿舍楼施工组织设计

(代做施工组织毕业设计)河南工程学院宿舍楼施工组织设计

  • 适用:本科,大专,自考
  • 更新时间2021年
  • 原价: ¥316
  • 活动价: ¥200 (活动截止日期:2021-02-28)
  • (到期后自动恢复原价)
(代做施工组织毕业设计)河南工程学院宿舍楼施工组织设计

                                    (代做施工组织毕业设计)河南工程学院宿舍楼施工组织设计

  摘     要
    河南工程学院宿舍楼,共五层,为框架结构,总建筑面积为3294.60m2。本次施工组织设计,是在施工图的基础上确定施工方案,明确施工工艺,计算出工程量,编制施工进度横道图,再根据场地地形,以及相临建筑物的位置,绘制场地平面布置图。在本设计中,我们有总的施工布置,如从基础到主体,从柱、梁到楼板、砌体;又有分项的工艺流程,如梁模板的支撑、钢筋的绑扎,混凝土的浇筑,还加入了安全管理、文明施工、应急措施等项目,使我们的施工组织设计更加全面、具体、,便于施工。总之,我们以保证质量、方便施工、便于管理为目标,加入自己的创新理念与土木行业中的前沿科技,以理论为指导,结合实践经验,使本次施工组织设计有科学性和使用性。
关键词:宿舍楼  施工组织   平面布置 基础工程
 
 
目    录
第一章:工 程 概 况············································(1)
1.1  工程特征··············································(1) 
1.2  建筑结构特征··········································(1)
1.2.1 建筑设计概况··········································(1)
1.2.2 结构设计概况·········································(1)
1.3  工程特点··············································(2)
第二章:施 工 部 署···········································(3)
2.1 施工目标················································(3) 
2.2 施工管理机构············································(3)
2.3施工任务安排及总体施工方案·······························(4)
2.3.1施工任务安排···········································(4)
2.3.2总体施工方案··········································(4)
2.4施工顺序·················································(5)
2.5施工现场平面布置 ········································(5)
 2.5.1施工现场平面图·········································(5)
 2.5.2临时设施安排···········································(6)
2.6施工进度计划············································(7)
2.7施工准备工作计划········································(7)
 2.7.1技术准备···············································(8)
 2.7.2劳动力准备·············································(8)
第三章:主要分布分项工程施工方法·····························(10)
       3.1工程测量················································(10)
       3.1.1轴线控制网测设········································(10)
       3.1.2基础、±0.000以下平面轴线投测·························(10)
       3.1.3±0.000以上部分轴线校测······························(10)
       3.1.4±0.000以上部分标高传递······························(11)
       3.2场地平整···············································(11)
       3.3防水工程················································(11)
       3.3.1SBS卷材防水···········································(12)
       3.3.2聚氨酯涂膜防水施工···································(14)
       3.4结构工程················································(17)
       3.4.1钢筋工程··············································(17)
       3.4.2模板工程··············································(20)
       3.4.3混凝土工程············································(27)
       3.4.4砌体工程··············································(30)
       3.5屋面工程················································(33)
       3.5.1屋面找平层············································(33)
       3.5.2屋面保温层施工········································(35)
       3.6装饰工程···············································(36)
       3.6.1抹灰工程··············································(36)
       3.6.2楼地面工程············································(39)
3.6.3门窗工程··············································(43)
 3.6.4吊顶工程·············································(50)
       3.7粉饰工程······················································(54)
       3.7.1内墙面乳胶漆··············································(54)
       3.7.2油漆工程···················································(54)
第四章:主要施工保证措施······································(60)
4.1工期保证措施···········································(60)
 4.1.1工期目标分期主要控制点·······························(60)
 4.1.2组织管理措施··········································(60)
 4.1.3技术保证措施··········································(60)
 4.1.4农忙和节假日保证工期的特殊措施························(61)
 4.1.5夜间施工措施··········································(61)
4.2质量保证措施···········································(62)
4.2.1质量实施计划··········································(62)
 4.2.2质量管理体系与管理流程·······························(64)
4.2.3质量控制措施与管理制度·······························(66)
4.2.4分部分项工程技术保证措施······························(69)
4.2.5材料、设备质量保证措施·······························(74)
4.2.6防渗漏措施···········································(74)
4.3  职业健康安全,文明现场保证措施·························(75)
 4.3.1基础、主体结构施工安全防护措施·························(75)
4.3.2装饰装修工程安全防护措施·····························(78)
 4.3.3防火安全管理措施·····································(79)
 4.3.4施工现场临时用电方案及安全措施························(80)
 4.3.5机械设备安全管理措施·································(83)
 4.3.6文明施工措施··········································(84)
4.4  环境保证措施··········································(87)
4.5雨季施工保证措施········································(89)
 4.5.1雨季施工领导体系·····································(89)
 4.5.2雨季施工准备工作措施··································(89)
 4.5.3主要分项工程雨季施工措施······························(91)
第五章:新技术、新材料、新工艺、新设备的应用···················(92)
       5.1  新技术、新材料、新工艺、新设备的计划·····················(92)
5.2 新技术、新材料、新工艺、新设备的措施······················(93)
 5.2.1在混凝土工程施工中采用以下新技术、新材料···············(93)
结 束语  ·························································(95)
致   谢  ·························································(96)
参考文献 ·························································(97)
 
 
 
 
 
第一章  工 程 概 况
1.1 工程特征
河南工程学院宿舍楼工程,位于河南工程学院内,由河南工程学院建设,建设目的是为了扩大学校规模,进一步扩大招生。本工程资金来源于自筹,工程总投资大约在2000万元左右。计划于XXXX年X月X日开工,于XXXX年X月X日竣工,施工图纸由济南市建筑设计研究院设计,山东省建筑设计研究院监理公司进行监理。
1.2 建筑结构特征
1.2.1 建筑设计概况
河南工程学院宿舍楼工程,建筑面积3294.60m2,总高度21.00m,长度68.040m,宽度21.240m,为框架结构,总共五层,底层层高4.35m,其他层层高3.6m,共设有两部楼梯,分别设在南、北面,南楼梯为主要通道。本工程外装饰:外墙为面砖和涂料,均为白色,铝合金窗;内装饰除卫生间外为混合砂浆抹面,刷乳胶漆,卫生间为贴面砖;普通实验室、硬件实验室、计算机教室、休息室等为纸面石膏板吊顶;铝合金门窗和木门;一层楼地面为面砖,二至四层为防静电地板;楼梯、走廊、休息室等为贴面砖;地下防水为卷材防水;屋面为膨胀珍珠岩保温、卷材防水屋面;卫生间为聚氨酯涂膜防水;室外台阶为大理石。
1.2.2 结构设计概况
河南工程学院宿舍楼工程为框架结构,采用人工成孔灌注桩基础;底层层高4.35m,其他层层高3.6m;框架部分梁、柱、现浇板、楼梯、现浇带为:C25,其他非承重结构构件为:C20;墙体采用240mm承重墙,MU7.5砖,M5.0混合砂浆砌筑;0.000标高以下采用MU7.5砖,M7.5水泥砂浆砌筑;框架填充墙采用240厚MU7.5砖,M5混合砂浆砌筑;其他框架梁上需设隔墙时均采用轻质材料制作,不得使用砌筑墙体,且不得在非框架梁上设置隔墙。
 
1.3工程特点
1、本工程工期紧,期间还跨越着麦收及雨季施工,时间紧、任务重。这是本工程最主要的特点之一。
2、该工程位于某学院院内,四周为图书馆、会堂、绿地等,现场施工交通组织难,现场文明要求高。
3、本工程时间性强。由于本工程处于学生学习集中区,夜间施工受限,在施工中要科学组织,合理安排工序、人力、机械、物资等,确保在建设单位要求工期内保质保量完成任务。
4、本工程位于校园工作、学习区,四周树木较多,环境优美,在施工过程中加强对树木的保护,“治污、控噪、防尘”是该工程的又一难关。
5、因施工地点在区内,如何减少施工与秩序相互影响,也是本工程施工中应考虑解决的重点问题。
针对上述工程特点,我们从工期安排,质量要求、与各方协调配合及沟通等方面均编制了相应的措施。
 
第二章  施 工 部 署
2.1 施工目标
1、质量目标:确保优良,争创“双十佳”。
2、工期目标:开工日期XXXX年X月X日,竣工时间XXXX年X月X日,日历日340天。(详见附录:施工进度网络图)
3、安全文明施工目标:重大伤亡事故率为零,一般事故率控制在1.5‰以内,达到市级安全文明工地标准。
4、环保目标:配合蓝天工程将污染降到最低,与现场有关的几大环保要素均达到国家及省市环保法规规定的标准。
 
2.2 施工管理机构
1、建立工程项目部,成立以项目经理为主及主要施工管理人员为辅的领导核心,由施工计划、施工技术、施工质量、施工安全、施工设备、施工材料、资料、文明施工及后勤管理等人员组成的管理班子,全面负责工程施工准备、施工实施、竣工验收的全过程管理工作。
2、项目主要管理人员工作职责
项目经理:全面负责现场生产、计划、质量、安全、进度、文明施工等工作,搞好与建设方、监理、协作方及外部的协调工作。
项目技术负责人:全面负责项目技术工作,组织图纸会审,组织编制施工组织设计,审定现场质量、安全措施,以及对设计变更等的交底工作。
施工员:参与编制施工组织设计,负责砌筑、支模、扎筋、浇捣等各项工作安排及进度协调,负责班组质量评定。
技术员:参与编制施工组织设计,负责现场施工技术措施的落实,编制并检查现场质量、安全措施,负责对施工翻样单的审核和签发,加工构件图的绘制,参加各班组各分项工程质量检查和评定。
质量员:具体负责现场施工质量,组织检查各分部分项工程的质量检查和验收,签发隐蔽工程验收单,参与工程材料和成品质量的验收。 
资料员、试验员:收集整理工程施工全过程的技术资料及往来文件,负责现场计量工作,根据规范要求做好砼及砂浆试块的制作、养护、试压等工作。
预算员(计划):根据计划进度排出设备、材料、成品的需用量计划,做好施工图预算及施工预算,指导现场合理用工用料,同时根据实际消耗和预算消耗进行成本核算。
材料员:根据工程进度计划制订、安排供料计划,及时采购所需材料、工具到场,负责外加工的检查、清点、保管、收发及通报有关部门。
安全员:具体负责各项安全措施的制订和落实,各项设施、设备的安装、调试、检查,现场安全生产、文明施工的管理,现场消防、卫生、保卫工作及劳务的管理。  
 
2.3 施工任务安排及总体施工方案
2.3.1 施工任务安排
1、本工程由中铁十一局建安公司第五项目公司承建管理,配属队伍为南通六建公司。
2、安装部分由中铁十一局建安公司第五项目部承建管理。
2.3.2 总体施工方案
1、基础及主体结构工程
整个工程分层分段组织流水施工,先地下后地上的原则。
基础结构的模板主要采用钢模板,钢筋连接主要采用对焊、机械连接。
±0.000以上主体结构采用覆面竹胶板模板,钢筋连接采用绑扎、对焊等方法。
本工程施工时外脚手架采用Ф48落地双排钢管脚手架,均采用密目式安全网全封闭,内脚手架均采用扣件式满堂脚手架。内墙砌筑采用工具式脚手架。
填充墙砌筑从下至上逐层施工,构造柱等零星砼工程穿插进行施工。
2、装饰工程
结构完成后即进入装饰施工阶段,各装饰分项提前计划,协助建设单位提前定案,为节约工期创造条件,主体结构备案后即进行装饰施工。为保证内装饰施工进度和质量,在屋面结构施工完成后先进行屋面防水层施工;为确保防水质量,屋面及卫生间的防水必须由专业队伍进行施工。各专业、各工种在项目部统一协调下合理穿插,配合紧凑。各专业施工前事先编制安装施工方案。各工种、各专业交叉作业时,注意做好已完工程的成品保护工作。装饰用内脚手架采用工具式脚手架,外脚手架采用结构施工时采用的外脚手架。
3、安装工程
针对工程特点,本工程有关设备的预留、预埋及安装作业将贯穿施工全过程,因此,施工前将制定切实可行的措施,施工中积极做好与设备专业的配合工作,使这一工作顺利展开。
水电安装与土建工程密切配合,合理穿插施工,提前计划、提前准备,服从工程总进度计划,确保预埋件、预留洞的正确性,杜绝事后开槽凿洞,严格按序及规范要求施工。
参 考 文 献
1. 刘宗仁.《土木工程施工》.高等教育出版社
2. 赵志缙.《建筑施工》.同济大学出版社
3. 《建筑施工手册》.中国建筑工业出版社
4. 江正荣.《建筑施工工程师手册》.中国建筑工业出版社
5. 《地区建筑工程预算定额》. 中国建筑工业出版社
6. 《全国统一建筑工程基础定额》. 中国建筑工业出版社
7. 《全国建筑安装工程统一劳动定额》. 中国建筑工业出版社
8. 《全国统一建筑安装工程工期定额》. 中国建筑工业出版社
9. 各种设计和施工标准图集
10. 现行施工及验收规范、安全技术和专项设计及施工规范
  • 关键词 施工 组织 河南 工程学院 宿舍楼 组织设计
  • 上一篇:六安远大幸福里10号楼施工组织设计
  • 下一篇:长洲水利枢纽外江部分施工组织设计
  • 暂无购买记录

    暂时没有评论

    真实

    多重认证,精挑细选的优质资源 优质老师。

    安全

    诚实交易,诚信为本。

    保密

    所有交易信息,都为您保密。

    专业

    10年专业经验,10年来帮助无数学子。